Sourcing service

Mixed-Brand Sourcing — One Order, Several Brands

The expensive part of a project is splitting it into several orders to make MOQ. We put different brands and form factors into one container against your project BOM — one MOQ, one after-sales channel.

1

One MOQ, one container, one after-sales channel

2

Out-of-stock models get spec-equivalent options — you decide, we never swap silently

3

Send the BOM and get a configuration and quote within 24 hours

01 Who it is for

  • System integrators whose BOMs mix APs, switches, bridges and adapters across brands.
  • Distributors and retail chains building a price-tier assortment rather than a single model.
  • Hotels, schools and campuses buying multi-year spares in one shipment.

02 How it works

1

① Send your BOM

Model, quantity and destination market are enough — or just the scenario and point counts.

2

② Align specs and equivalents

For out-of-stock or EOL models we propose several spec-equivalent options and let you decide — no silent substitutions.

3

③ Quote and configuration sheet

Line-by-line pricing with MOQ, lead time and certification status; no placeholders in the spec sheet.

4

④ Production and inspection

Sampling inspection with test records on request, and third-party inspection is welcome.

5

⑤ Consolidation and shipping

We consolidate by destination and volume, and provide the packing list and photos before shipment.

03 What one order can cover

StageWe handleYou confirm
SelectionParameter ranges and same-tier options across brandsFinal models and quantities
Power and accessoriesPoE budget, injectors, pole mounts, patch leadsSite power conditions
CertificationExisting CE / FCC / RoHS files, verified per modelDestination market requirements
After-salesOne interface for batch issues and sparesSpare ratio

Questions

Q1 Does mixing brands delay the lead time?

Usually shorter, since one consolidated order avoids waiting for several shipments. If one brand is capacity-constrained we flag it early and schedule that line separately.

Q2 How is MOQ calculated?

Whichever is higher: the container-level or the model-level MOQ. Exact figures come with the quotation, as they differ by model.

Q3 Can I start with a small trial order?

Yes — a small validation batch before scaling is common, and trial orders still come with the configuration sheet and test records.

Related knowledge

Send the project BOM and we will return the configuration and quote within 24 hours.

Get a Quote

Need a quote or a coverage design for your project?

Send models, quantity, coverage scenario and target market. Our team replies within 24h.

Free Selection AdviceReply in 24hConfidential InquiryOEM Support
Get a Quote

Prepare: model, quantity, scenario

WhatsApp Us sales@wirelessapfactory.com