
Need a selection or coverage plan for your project?
Send the scenario, area and client density; our team replies with a configuration proposal within 24h.
Send InquiryWhat can be customised
OEM/ODM for wireless APs covers the following layers; pick the ones your project needs.
- Appearance: enclosure colour, printed logo, LED and button placement
- Firmware: login branding, default SSID prefix, languages and feature toggles
- Frequency and channels: lock bands and power limits to local regulation
- Packaging: colour box, manual, accessories and multilingual labels
- Certification: prepare CE/FCC testing and documents for the target market
Standard process
The usual flow is below; mass production starts after sample approval, and spot checks are recommended during production.
- 1. Requirement confirmation: model, quantity, customisation and market
- 2. Quotation and sampling: confirm feasibility and sample cost
- 3. Sample approval: check appearance, firmware and packaging item by item
- 4. Pilot and mass production against the approved sample
- 5. Inspection and shipment: provide inspection photos and test reports
Lead time and MOQ
Standard models usually ship in 7–20 days; customised models take 20–35 days depending on scope and quantity. MOQ depends on the customisation — packaging and logo changes are far cheaper to start than tooling or firmware feature work.


